Pakistan version. Works from monthly units on a Pakistani bill, 550 W panels and 400/230 V, and explains NEPRA's prosumer rules: net billing, the sanctioned load cap and the 25 kW threshold. US version
Solar Panel and System Size Calculator (Pakistan)
How many solar panels and what size system you need in Pakistan, from monthly units on your bill, with NEPRA's net billing rules and the sanctioned load limit.
The interactive tool loads here when JavaScript runs.
About this toolWhat is the Solar Panel Calculator?
Start from the units (kWh) on your electricity bill. Enter your monthly units, the peak sun hours for your city and the panel size, and the calculator gives the system size in kW, the number of panels and the daily output. This version opens on 500 units a month and 550 W panels.
The rules for connecting to the grid changed in 2026. The NEPRA (Prosumer) Regulations, 2026 repealed the 2015 net metering regulations. Under net billing, the units your distribution company supplies are billed at the applicable tariff, and the units you export are credited at the national average energy purchase price. Compare the two rates before sizing for export: every unit you use yourself avoids the full tariff, while an exported unit earns only the purchase price.
Two limits shape the size before the maths does. The applicant must be a 3 phase 400 V or 11 kV consumer, and the system cannot exceed the sanctioned load of the premises. A house with a 7 kW sanctioned load is capped at 7 kW of solar, whatever the calculator says the units would justify.
- Daily, monthly or yearly kWh input
- User-supplied peak sun hours with guidance on PVWatts and PVGIS
- Panel count, array kW and expected production
- Battery bank for days of autonomy at 12, 24 or 48 V
- MPPT charge controller current with 125% margin
- Panels-versus-sun-hours table
Updated
How to use the Solar Panel Calculator
- Enter your energy use in kWh per day, month or year. A year of utility bills gives the best figure.
- Enter peak sun hours for your site from PVWatts or PVGIS (worst month for off-grid, annual average for grid-tied).
- Keep 14% losses unless you know better, and enter the panel wattage you plan to buy.
- For a battery system, enter days of autonomy, bank voltage, usable depth of discharge and inverter efficiency. Set days to 0 for a grid-tied system.
- Read the panel count, array kW, expected output, battery size and charge controller rating.
Worked examples
House using 500 units a month
Input
500 kWh per month, 5 peak sun hours, 14% losses, 550 W panels, no battery
Output
3.82 kW minimum; 7 panels = 3.85 kW; about 16.6 kWh a day at 5 sun hours
This matches the units across the day, not when they are used. Evening fans, lights and the fridge still come from the grid or a battery, and under net billing the daytime surplus is credited at the national average energy purchase price, not at your tariff. The 5 sun hours are an assumed input; take your own from PVGIS.
Summer bill of 900 units against a 7 kW sanctioned load
Input
900 kWh per month, 550 W panels, 14% losses, no battery; at 5 and at 4 peak sun hours
Output
13 panels = 7.15 kW at 5 sun hours; 16 panels = 8.8 kW at 4 sun hours
Both answers exceed a 7 kW sanctioned load, which is the most the regulations allow. Twelve 550 W panels (6.6 kW) keeps the panels themselves under the cap; ask your DISCO whether it checks the panel or the inverter rating against the sanctioned load. Either accept a smaller share of the summer bill or apply to the distribution company to raise the sanctioned load first.
Backup battery for load shedding: 24 V lead-acid or 48 V lithium
Input
6 kWh per day, 5 sun hours, 550 W panels, half a day of battery; 24 V at 50% depth of discharge, then 48 V at 90%
Output
3 panels (1.65 kW); 6.32 kWh battery = 263 Ah at 24 V (controller 85.9 A); or 3.51 kWh = 73.1 Ah at 48 V (controller 43.0 A)
Lead-acid needs nearly twice the capacity for the same usable energy because only half of it is used. Moving to 48 V halves the controller current and the cable size for the same array.
Background and insight
A solar panel's rating is its output at standard test conditions: 1,000 W/m² of sunlight at 25 °C cell temperature. Peak sun hours express a site's daily solar energy on the panel as the number of hours of that standard sun: 4.5 kWh/m²/day is 4.5 peak sun hours. The array size follows directly: kW = daily kWh ÷ (peak sun hours × (1 − losses)). 30 kWh a day at 4.5 hours and 14% losses needs 7.75 kW, which is 20 panels of 400 W.
System losses cover everything between the nameplate and your meter: soiling, shading, wiring, mismatch, inverter conversion, cell temperature and degradation. PVWatts uses 14% as its default total. Hot climates and dusty sites run higher; carefully designed systems with microinverters and clean panels can run lower.
Peak sun hours vary with location, tilt and season, so this tool does not guess them. Use PVWatts or the NSRDB from the National Laboratory of the Rockies (formerly NREL) for the US, or the European Commission's PVGIS for Europe, Africa and Asia, and read the value for your tilt. For grid-tied systems the annual average is right; for off-grid, design to the worst month you need to cover. Battery sizing is Wh = daily Wh × days ÷ (depth of discharge × inverter efficiency), and MPPT controller output current is array watts ÷ battery voltage, with a 25% margin in line with the NEC 690.8 practice of sizing PV circuits at 125% of their maximum current.
Common use cases
Quotes sanity check
Compare an installer's proposed system size with what your usage and sun hours call for.
Off-grid design
Size panels, battery and controller together for a cabin, van, boat or remote monitoring site.
Backup planning
Work out how much battery and solar keep essential loads running through a multi-day outage.
Roof space planning
Turn a kW target into a panel count to see whether it fits.
Tips and limitations
- Check the sanctioned load on your bill before you choose a system size; the regulations cap the solar capacity at that figure.
- If your house has a single-phase connection, the regulations' definition of an applicant (3 phase 400 V or 11 kV consumer) means you need a three-phase connection before you can apply as a prosumer.
- For systems of 25 kW or less there is no NEPRA fee, and since the August 2026 amendment the distribution company approves them without NEPRA concurrence. Above 25 kW, the concurrence fee is Rs 1,000 per kW.
- Use the worst month you need to cover for an off-grid or backup system, and the yearly average for a grid-tied one.
Sources and further reading
- National Electric Power Regulatory Authority (Prosumer) Regulations, 2026 (S.R.O. 251(I)/2026), NEPRA. Applicants are 3 phase 400 V or 11 kV consumers; capacity up to the sanctioned load; net billing at the national average energy purchase price; 2015 net metering regulations repealed.
- Amendment to the NEPRA (Prosumer) Regulations, 2026 (S.R.O. 1330(I)/2026, 6 August 2026), NEPRA. Systems of 25 kW or below need no NEPRA concurrence; the distribution company gives approval.
- Fee for prosumers (S.R.O. of 28 April 2026), NEPRA. No fee for 25 kW or less; Rs 1,000 per kW one-time fee above 25 kW.
- NEPRA Performance Standards (Distribution) Rules, 2005, with amendments, NEPRA. Nominal 400/230 V within ±5% for at least 95% of consumers, 50 Hz ±1%, and the priority order for load shedding.
- PVGIS: Photovoltaic Geographical Information System, European Commission Joint Research Centre. Solar radiation and PV performance for any location worldwide.
Frequently asked questions
Is net metering still available in Pakistan?
The NEPRA (Prosumer) Regulations, 2026, notified on 9 February 2026, repealed the 2015 net metering regulations and replaced them with net billing. Prosumers with agreements under the old regulations are billed at the national average power purchase price until their agreement expires, and at the national average energy purchase price on renewal.
How does net billing work?
At the end of each 30-day billing cycle, units supplied to you are billed at the applicable tariff and units you supply are credited at the national average energy purchase price. If the credit is larger than the bill, it is carried to the next bill or paid to you quarterly. NEPRA can revise the export rate during the agreement.
How many kW of solar can I install?
No more than the sanctioned load of the premises. The distribution company will also refuse new applications on a distribution transformer once the solar connected to it reaches 80% of its rated capacity, and systems of 250 kW or more need a load flow study.
Can a single-phase house get a prosumer connection?
The regulations define an applicant as a 3 phase 400 V or 11 kV consumer, so a single-phase connection would first need to be converted. A single-phase house can still run off-grid or backup solar with a battery, without exporting.
How many panels do I need for 500 units a month?
At 5 peak sun hours and 14% losses, about 3.8 kW: seven 550 W panels. At 4 sun hours the same bill needs nine panels. The table under the result shows the count at each level from 2 to 7 hours.
What fee do I pay to NEPRA?
Under NEPRA's fee notification of 28 April 2026, there is no fee for a system of 25 kW or less and a one-time fee of Rs 1,000 per kW above 25 kW. The distribution company's own connection charges for the meter and interconnection are separate.
Is there an in-depth guide to the Solar Panel Calculator?
Yes. “How Many Solar Panels Do I Need? Sizing Arrays and Batteries” covers the background, how it works, common pitfalls and worked examples. Read the full guide.