Kanban Board
A private drag-and-drop Kanban board that saves in your browser: custom columns, priorities, tags, fullscreen view and JSON export and import.
The interactive tool loads here when JavaScript runs.
About this toolWhat is the Kanban Board?
The Kanban Board is a single, private board that runs in your browser. It starts with To Do, In Progress, In Review and Done columns. Add cards with a title, description, priority (low, medium or high) and tags, drag them between columns or reorder them, and drag whole columns to change the flow. Columns can be renamed, recoloured, added and deleted.
The board saves itself to your browser's localStorage a moment after each change, so it is there when you come back on the same browser and device. Export downloads the whole board as a JSON file and Import loads one back, which is also how you move a board to another machine or keep a backup. Imported files are checked first, so a wrong JSON file is rejected instead of wiping the board.
There is no account, server or sharing: nobody else can see the board, and clearing site data or using a private window removes it. It is a personal or small-team planning board, not a replacement for a tracker with assignees and history.
- Drag-and-drop cards and columns
- Priorities, tags and descriptions on cards
- Custom column names and colours
- Autosave to localStorage, JSON export and validated import
- Fullscreen mode; no account, everything stays in your browser
Updated
How to use the Kanban Board
- Click the board title to rename it. Use the + button beside the title to add a column, and the pencil icon on a column header to rename or recolour it.
- Click Add Task at the bottom of a column, enter a title, optional description, priority and tags, and save.
- Drag cards within or between columns; drag a column by its header to reorder the flow.
- Use Fullscreen for a distraction-free view, and Exit Fullscreen to return.
- Click Export to save a JSON backup, and Import to load a board file on this or another browser.
Background and insight
Kanban comes from Toyota's production system, developed by Taiichi Ohno from the late 1940s. The word means "signboard" or "card" in Japanese: a card travelled with each batch of parts and a new batch was made only when a card came back, so work was pulled by demand instead of pushed by a schedule. David J. Anderson adapted the idea to software teams in the mid-2000s, and his 2010 book made "Kanban method" a standard term.
The board is the visible part. The useful part is limiting work in progress. Little's Law, from queueing theory, says average cycle time equals average work in progress divided by average throughput: if a team finishes 5 items a week and has 20 in progress, each takes about 4 weeks. Cut work in progress to 10 and, at the same throughput, items finish in about 2 weeks. That is why Kanban teams put a WIP limit on columns and stop starting new work when a column is full.
This board does not enforce WIP limits or track cycle times; it shows a count on each column header. A simple convention works: write the limit in the column title, such as "In Progress (3)", and treat a full column as a signal to finish or unblock something before pulling a new card.
Common use cases
Personal task tracking
Run your own week on To Do, Doing and Done without signing up for a project tool.
A sprint for a small team on one screen
Put the board in fullscreen on a shared display during stand-up.
Planning a side project
Break a launch into cards, tag them by area and move them along as you go.
Teaching Kanban
Show how pulling work and limiting columns changes flow, without accounts or setup.
Private brainstorming
Sort ideas into columns locally when you do not want them in a company tool yet.
Tips and limitations
- Export regularly. localStorage is per browser and per device, and clearing site data deletes the board.
- Keep the columns few and named after states, not people: To Do, In Progress, Review, Done.
- Put a WIP limit in the column name, for example "In Progress (3)", and respect it.
- Write card titles as outcomes ("Checkout supports Apple Pay") rather than activities ("Work on payments").
- The bin icon beside the board title (Clear Board) resets to the four default columns and deletes every card; export first if you might want them back.
- Only one board is stored per browser. Use Export and Import to switch between several.
Sources and further reading
- Toyota Production System, Toyota Motor Corporation. Toyota's own account of just-in-time and kanban
- A Proof for the Queuing Formula: L = λW, Operations Research. John Little's 1961 proof of Little's Law
Frequently asked questions
Where is my Kanban board saved?
In your browser's localStorage on this device, under the key kanban-board-data. Nothing is sent to a server. It survives reloads and restarts, but not clearing site data, private browsing or switching to another browser or computer, so use Export to keep a JSON backup.
How do I move my Kanban board to another computer?
Click Export to download the board as a JSON file, copy that file to the other computer, open this page there and click Import. The board, columns, cards, priorities and tags come across exactly. Import replaces the board currently in that browser, so export it first if it matters.
Can I share the board with my team?
Not live. The board has no server, so there is no shared link or real-time editing. You can share a snapshot by sending the exported JSON file, which a colleague imports into their own browser. For ongoing team work with assignees and history, use a hosted tracker.
What is a WIP limit on a Kanban board?
A work-in-progress limit caps how many cards may sit in a column at once. When the column is full, the team finishes or unblocks existing work before pulling new cards. By Little's Law, less work in progress at the same throughput means shorter cycle times. This board shows counts but does not enforce limits.
What is the difference between Kanban and Scrum?
Scrum works in fixed-length sprints with planned scope, defined roles and ceremonies such as sprint planning and retrospectives. Kanban has no sprints; work flows continuously, and the main controls are visualising the work and limiting work in progress. Many teams mix the two, using a Kanban board inside Scrum sprints.
Why did my imported Kanban file fail to load?
Import accepts only board exports: a JSON object with a columns array, where each column has a tasks array. Other JSON, or a file edited into a different shape, is rejected so it cannot blank the board. Missing fields such as priority or tags are filled with defaults.
Is there an in-depth guide to the Kanban Board?
Yes. “Kanban Boards That Improve Flow: WIP Limits and Little's Law” covers the background, how it works, common pitfalls and worked examples. Read the full guide.
Related Tools You May Like
Free, in-browser tools that pair well with this one.