Australia version. Uses IEC ratings at 50 Hz with 400 V secondaries and 11 kV or 22 kV primaries, and notes the GEMS minimum energy rules for distribution transformers. US version
Transformer Sizing Calculator (Australia, IEC ratings)
Size a 50 Hz transformer from kW, kVA or amps, pick the next IEC rating and get full-load currents at 11 kV or 22 kV and 400 V, with notes on GEMS rules.
The interactive tool loads here when JavaScript runs.
About this toolWhat is the Transformer Sizing Calculator?
Distribution transformers in Australia are built for 11 kV and 22 kV networks, and a site that takes a high-voltage supply needs one to step down to 230/400 V. This version opens on an 11 kV to 400 V unit chosen from the IEC rating list.
Give it the after-diversity load as kW with a power factor, kVA or measured amps, add a growth margin, and it returns the next standard rating, how loaded it will be and the full-load currents on each side. A 600 kVA load with 20% spare needs 720 kVA, so the answer is 800 kVA, carrying 1,155 A on the 400 V side.
Transformers in the 10 to 2,500 kVA range for networks up to 24 kV are covered by a Greenhouse and Energy Minimum Standards determination, so the unit you buy must meet minimum efficiency levels as well as the rating.
- Load from kW and PF, kVA or amps
- Spare capacity and next standard rating (ANSI or IEC lists)
- Primary and secondary full-load and actual load currents
- Voltage (turns) ratio
- Comparison table of neighbouring sizes
Updated
How to use the Transformer Sizing Calculator
- Choose single-phase or three-phase.
- Enter the load as kW with power factor, as kVA, or as amps at the secondary voltage.
- Set the spare capacity you want, for example 20% for growth.
- Enter the primary and secondary voltages (line to line for three-phase) and choose North American or IEC ratings.
- Read the standard size, how heavily it is loaded today, the full-load currents and the voltage ratio.
Worked examples
Commercial building on 11 kV
Input
Three-phase, 600 kVA, 20% spare, 11,000 V to 400 V, IEC ratings
Output
720 kVA required, 800 kVA (75% loaded); 42.0 A at 11 kV, 1,154.7 A at 400 V
The 400 V full-load current sets the main switch and busbar rating at the main switchboard.
Same load on a 22 kV feeder
Input
Three-phase, 600 kVA, 20% spare, 22,000 V to 400 V
Output
800 kVA; 21.0 A at 22 kV, 1,154.7 A at 400 V
Doubling the primary voltage halves the primary current; the low-voltage side is unchanged.
Measured 180 A per phase at the main switchboard
Input
Three-phase, 180 A at 400 V, 20% spare, 11,000 V primary
Output
124.7 kVA load, 149.6 kVA required, 160 kVA (78% loaded)
Use the maximum demand from logged data rather than a single reading, since a spot reading can miss the peak.
Background and insight
Transformers are rated in kVA rather than kW because their heating depends on current and voltage, not on the power factor of the load. Full-load current is I = kVA × 1000 ÷ V for single-phase and I = kVA × 1000 ÷ (√3 × V(LL)) for three-phase. A 75 kVA three-phase unit stepping 480 V down to 208Y/120 V carries 90.2 A on the primary and 208.2 A on the secondary.
The load figure should be the calculated demand, after any diversity your code allows, not the sum of nameplates. Designers then add spare capacity, commonly 20 to 25%, so that the unit runs at about 80% of its rating today. That margin covers growth, keeps losses and temperature rise down, and leaves room for motor starting. Harmonic-rich loads (computers, drives, LED drivers) may need a K-factor rated transformer or a further derating.
For an ideal transformer the voltage ratio equals the turns ratio, a = Vp ÷ Vs = Np ÷ Ns, and current goes the other way: Is = Ip × a. In three-phase units the per-winding ratio depends on the connection; a delta-wye 480 to 208Y/120 V transformer has 480 V on each delta winding and 120 V on each wye winding, a winding ratio of 4:1, even though the line-to-line ratio is 2.31:1. Ratings follow ANSI/IEEE C57.12 series standards in North America and IEC 60076 elsewhere; protection follows NEC 450.3 or your local code.
Common use cases
Specifying a step-down transformer
Choose the kVA for a 480 to 208/120 V panel feeding receptacles and lighting.
Machine isolation transformers
Size a control or isolation transformer for imported equipment that needs a different voltage.
Checking an existing unit
See how loaded a transformer is by entering the measured secondary amps.
Planning protection
Get primary and secondary full-load amps as the starting point for breakers and conductors.
Tips and limitations
- Ask suppliers for units registered under the GEMS determination for power transformers; it covers oil-immersed and dry-type units from 10 to 2,500 kVA with a highest system voltage up to 24 kV.
- Check the distributor's high-voltage connection rules (Section 7 of the NSW rules) before choosing the transformer; they set protection and metering arrangements.
- Single-wire earth return (SWER) transformers are a separate product class in the GEMS determination. The IEC list here starts at 25 kVA, so use the currents rather than the suggested rating for anything smaller.
- Use maximum demand worked out under AS/NZS 3000 for the load figure.
Sources and further reading
- Greenhouse and Energy Minimum Standards (Power Transformers) Determination 2012, Federal Register of Legislation. Section 5: 10 kVA to 2,500 kVA, system highest voltage up to 24 kV, product classes.
- Service and Installation Rules of NSW (April 2026), NSW Department of Climate Change, Energy, the Environment and Water. Clause 1.11.1 (230/400 V, 50 Hz) and clause 1.11.3 (supply at high voltage).
- IEC 60076-1 Power transformers: General, International Electrotechnical Commission
Frequently asked questions
What transformer sizes are used in Australia?
Distribution transformers follow IEC preferred ratings. The calculator's IEC list rounds up within 25, 50, 63, 100, 160, 200, 250, 315, 400, 500, 630, 800, 1,000, 1,250, 1,600, 2,000, 2,500 and 3,150 kVA. Confirm availability with the maker.
Do transformers have to meet minimum energy standards?
Yes. The Greenhouse and Energy Minimum Standards (Power Transformers) Determination 2012 covers power transformers from 10 to 2,500 kVA with a system highest voltage up to 24 kV, in oil-immersed, dry-type and SWER classes, reflecting the scope of AS 2374.1.2.
How many amps is an 800 kVA transformer at 400 V?
800,000 ÷ (√3 × 400) = 1,154.7 A. On an 11 kV primary it is 42.0 A, and on 22 kV it is 21.0 A.
What is the supply voltage on the low-voltage side?
Nominal 230/400 V at 50 Hz from a three-phase, four-wire system, as set out in clause 1.11.1 of the NSW Service and Installation Rules, which refers to AS IEC 60038.
Should I size for 80% loading?
It is a common design margin, not a rule. Hot switch rooms, load growth and large motor starts all argue for more headroom; a well-known steady load may need less.
Is there an in-depth guide to the Transformer Sizing Calculator?
Yes. “Transformer Sizing: kVA, Full-Load Amps and Standard Ratings” covers the background, how it works, common pitfalls and worked examples. Read the full guide.