United Kingdom version. Explains where a 5x5 matrix fits the legal duty in regulation 3 of the Management of Health and Safety at Work Regulations, HSE's five steps, and the HM Treasury Orange Book. US version
Risk Assessment Matrix (UK)
Score hazards on a 5x5 likelihood and impact grid, then record findings, controls and re-scores the way HSE guidance and the Management Regulations expect.
The interactive tool loads here when JavaScript runs.
About this toolWhat is the Risk Assessment Matrix?
In Great Britain the legal duty is to make a "suitable and sufficient" assessment of the risks to employees and anyone else affected by your work (regulation 3 of the Management of Health and Safety at Work Regulations 1999). If you employ five or more people you must record the significant findings. Nothing in the regulation or in HSE's own guidance requires a scoring matrix: HSE's template records the hazard, who might be harmed and how, what you already do, what more is needed, who acts and by when.
A 5x5 grid earns its place when you have more hazards than you can fix at once. HSE asks you to decide how likely it is that someone could be harmed and how serious it could be; the grid turns those two judgements into a score so you can rank actions. Score the hazard with today's controls, add the further controls in the mitigation field, then add the same hazard again with "(residual)" in the name to show the drop. The colour bands here (1 to 4 Low, 5 to 9 Medium, 10 to 16 High, 20 and 25 Critical) are a convention, not an HSE standard, so write your own definitions for each level before you score.
Public bodies work to a different document. HM Treasury's Orange Book asks for a common set of risk criteria based on likelihood and consequence, and says the consequence rating should reflect the highest, most credible worst-case scenario. That is a useful rule for any register: rate impact on the credible worst case, not the average day.
- 5x5 grid with Low, Medium, High and Critical colour bands
- Score out of 25 and level badge for every risk
- Five risk categories and a mitigation field per risk
- JSON export and import, with ratings clamped to 1-5 on import
- Sample register for a product launch
Updated
How to use the Risk Assessment Matrix
- Set the assessment title, for example "Mobile app launch, Q1 2027".
- Click Add Risk, fill in the risk name and description, then pick Probability (1-5), Impact (1-5) and a Category: Operational, Financial, Strategic, Compliance or Technical.
- Write a mitigation strategy and click Add Risk in the form. The risk appears in its grid cell and in the Risk List with its score and level.
- Click Load Sample to see six scored risks for a mobile app launch.
- Use Export to save the register as JSON and Import to load it again; Clear All empties it.
Worked examples
Manual handling at a small warehouse
Input
Hazard: lifting 25 kg cartons from floor pallets. Before: probability 4 x impact 3. After a pallet lifter and a team-lift rule: probability 2 x impact 3
Output
Before 12/25 High; residual 6/25 Medium
The controls change how likely an injury is, not how bad a back injury can be, so only the probability falls. Record both rows: the residual entry is the evidence for HSE's "what further action" and "review the controls" steps.
A council project register on Orange Book lines
Input
Contractor insolvency: probability 2 x impact 5. With a performance bond and step-in rights: probability 1 x impact 5
Output
10/25 High, then 5/25 Medium
Impact stays at 5 because the Orange Book asks for the most credible worst case: a stalled build. Even after mitigation the risk lands in Medium only because probability is at its floor, which is a reason to keep a named owner on it.
Background and insight
Likelihood times impact is the oldest shortcut in risk management, and the 5x5 version is the one most project and operational risk registers use. ISO 31000 (the risk management guidelines, last revised in 2018) asks organisations to analyse likelihood and consequence but does not require a matrix or any particular bands; the bands here are a common convention, not a standard.
Because the scales are ordinal, a score of 12 is not "twice as risky" as 6. Only fourteen distinct scores are possible (1, 2, 3, 4, 5, 6, 8, 9, 10, 12, 15, 16, 20, 25), and a 5x1 risk (near certain, trivial) scores the same as a 1x5 risk (rare, catastrophic) even though most boards would treat them very differently. Louis Anthony Cox Jr. set out these problems in his 2008 paper "What's Wrong with Risk Matrices?" in Risk Analysis.
The practical fix is to define the scales before anyone scores. Write down what a 4 for impact means in money, days of delay or customers affected, and what a 3 for probability means as a rough percentage over a stated period. Without that, two people will score the same risk two levels apart and the grid becomes a record of who was in the room.
Common use cases
Project risk registers
Project managers score launch, migration or construction risks and review the red and orange cells at each steering meeting.
Operational and vendor risk
Ops and procurement teams rate supplier failure, outages and key-person dependencies on one grid.
Compliance and audit prep
Show auditors a dated register with scores and mitigations, exported as JSON for the evidence file.
Board and investor updates
Summarise the top risks visually instead of a long table.
Tips and limitations
- Write the hazard into the risk name ("slips on wet kitchen floor"), not just the outcome. HSE's steps start from hazards, and a register of outcomes is hard to act on.
- HSE warns against copying an example assessment and putting your company name on it. Use the sample register only to see how the grid behaves.
- Review after accidents, near misses or changes to staff, processes, substances or equipment. Regulation 3(3) requires a review when the assessment may no longer be valid or there has been a significant change.
- Under the Orange Book, risk evaluation compares the result with your risk appetite. Agree which band needs board or senior attention before the first workshop, not after.
Sources and further reading
- The Management of Health and Safety at Work Regulations 1999, regulation 3, legislation.gov.uk. The suitable and sufficient duty, review triggers and recording when five or more are employed.
- Steps needed to manage risk, Health and Safety Executive
- Risk assessment template and examples, Health and Safety Executive
- The Orange Book: Management of Risk, Principles and Concepts, HM Treasury and Government Finance Function. Risk criteria, likelihood and consequence, and rating on the most credible worst case.
Frequently asked questions
Does HSE require a risk matrix?
No. The legal duty is a suitable and sufficient assessment, and HSE's template has no scoring column. A matrix is one way to decide how likely and how serious harm could be, and to rank what to fix first.
Do I have to write my risk assessment down?
If you employ five or more people, yes: you must record the significant findings, including the hazards, who might be harmed and how, and what you are doing to control the risks. Below that, a written record is still the easiest way to show what you decided.
Is a 5x5 risk matrix used in UK health and safety?
Widely, but by convention rather than by rule. HSE guidance does not set a grid size or colour bands. If you use one, define each likelihood and severity level in words so two assessors give the same score.
What does "reasonably practicable" mean when I score residual risk?
HSE explains it as balancing the level of risk against the money, time or trouble needed to control it. A residual score in the High band means you should look for further controls that pass that test, not that you can stop.
How does the Orange Book say impact should be rated?
On the highest, most credible worst-case scenario. Risk analysis should use common criteria based on the likelihood of the risk occurring and the consequences should it happen, so risks can be compared across an organisation.
How often should I review a risk assessment in the UK?
Regulation 3 sets no fixed interval. It requires a review when there is reason to suspect the assessment is no longer valid or there has been a significant change, and HSE adds accidents, near misses and problems workers spot as triggers.
Is there an in-depth guide to the Risk Assessment Matrix?
Yes. “How to Use a 5x5 Risk Matrix (and Where Its Scores Mislead)” covers the background, how it works, common pitfalls and worked examples. Read the full guide.
Related Tools You May Like
Free, in-browser tools that pair well with this one.