Will My Battery Last Through Load Shedding? Runtime Maths
Battery runtime for South African backup: Eskom's 2.5 and 4.5-hour slots, lithium against AGM, Peukert's law, recharge time between slots and the CoC rules.
By Redbison Dev · · 10 min read

South Africa edition. Written for South African backup power: Eskom's load-shedding blocks with the 30-minute switching allowance, 51.2 V lithium and 12 V or 24 V AGM banks, recharge between slots at higher stages, and Eskom's registration and Certificate of Compliance rules. US edition
The South African version of "how long will this battery last?" has a deadline attached: the end of the load-shedding slot. Eskom's schedule guide says stages 1 to 4 run in 2-hour blocks in most of the country and 4-hour blocks in Eskom-supplied Johannesburg areas, and that each block has 30 minutes added for network switching. So the targets are 2.5 hours and 4.5 hours, not 2 and 4. Eskom's page calls load shedding an emergency measure for limited periods, so the schedule applies only while a stage is declared; check the current status on Eskom's load-shedding site or the MyEskom app. The same sizing covers municipal outages and planned maintenance. Whether a battery makes it depends on its usable energy, the inverter's losses and, for lead-acid, Peukert's law, which takes a bite out of the rated capacity whenever you draw heavily. This edition works through those factors for typical South African set-ups with the Load Shedding Battery Runtime Calculator.
The slot you have to cover
Eskom's guide to interpreting load-shedding schedules sets out how often an area can be shed over a four-day period:
| Stage | Up to | Slots in four days |
|---|---|---|
| 1 | 1,000 MW shed | 3 two-hour slots |
| 2 | 2,000 MW | 6 two-hour slots |
| 4 | 4,000 MW | 12 two-hour slots |
| 6 | 6,000 MW | 6 two-hour and 6 four-hour slots |
| 8 | 8,000 MW | 12 four-hour slots |
Each slot can mean up to 2.5 or 4.5 hours without power once switching is added. Two things follow. First, size the battery for the longest slot your area gets. Second, at the higher stages the gap between slots can be short, so the battery has to recharge as well as last.
The runtime equation
runtime (hours) = usable energy / power drawn from the battery
= (Ah x V x depth of discharge) / (load W / inverter efficiency)
- Watt-hours are the honest unit. A 12 V 100 Ah AGM battery stores 1,200 Wh; a 51.2 V 100 Ah lithium (LiFePO4) battery, the common "5 kWh" wall unit, stores 5,120 Wh.
- Depth of discharge. Lead-acid batteries last far longer if you stop at about half; lithium iron phosphate is routinely used to 80 to 90%, with the battery management system cutting off before damage.
- Inverter efficiency. A 600 W AC load through a 92% efficient inverter takes 652 W from the battery. The inverter's own idle draw comes on top, from its data sheet.
Worked example: a 5 kWh lithium battery and a family evening
Enter a 51.2 V 100 Ah LiFePO4 battery, a 600 W AC load (fridge, lights, TV, router, laptops and a fan, averaged), a 92% inverter and 90% depth of discharge. Peukert stays off for lithium. The calculator gives:
- usable energy 4,608 Wh, current from the battery 12.7 A
- runtime 7 h 4 min
That covers a 4.5-hour Johannesburg slot with about 2.5 hours in hand. Double the load to 1,200 W, for example by putting the kettle and microwave on the inverter for part of the evening, and the runtime halves to 3 h 32 min: still enough for a 2.5-hour slot, short of a 4.5-hour one. A geyser element of 3 kW or so on the same inverter would empty the battery in well under two hours, which is why installers leave geysers, stoves and kettles off the backup circuit.
Then check the recharge. The 4.5-hour slot at 600 W takes about 2.9 kWh out of the battery (600 W / 0.92 x 4.5 h). If the inverter's charger or your panels can put back 1 kW, refilling it takes about three hours, plus charging losses. At stage 6 an area can face a 4-hour slot and a 2-hour slot on the same day, so look at the gap between them on your schedule before you trust the 7-hour figure.
Peukert's law: why lead-acid falls short
In 1897 Wilhelm Peukert showed that a lead-acid battery delivers less of its rated capacity the faster you discharge it. In the form used today:
t = H x (C / (I x H))^k
where C is the rated capacity in Ah at the H-hour rate (usually 20 hours, C/20), I is the actual current and k is the Peukert exponent. Typical values are about 1.1 to 1.15 for AGM and gel, 1.2 to 1.3 for flooded batteries and close to 1 for lithium, but take the figure for your battery from its data sheet. At the rated current the bracket is 1 and nothing changes. Draw more and the runtime drops faster than simple division predicts.
Take a common budget set-up: two 12 V 100 Ah AGM batteries in series to make a 24 V 100 Ah bank, 50% depth of discharge, a 90% inverter and k = 1.15 at C/20.
| Load | Current | Ideal runtime | With Peukert | Effective capacity |
|---|---|---|---|---|
| 300 W | 13.9 A | 3 h 36 min | 3 h 5 min | 85.8 Ah |
| 600 W | 27.8 A | 1 h 48 min | 1 h 24 min | 77.3 Ah |
At 300 W the bank covers a 2.5-hour slot with half an hour to spare. At 600 W it does not cover even that, and the Peukert loss has grown from 14% to 23% of the ideal runtime. A single 12 V 200 Ah battery stores the same 2,400 Wh and gives the same answer, because what matters for Peukert is the current relative to the capacity, not the voltage on its own.
Sizing for a target slot
Turn the equation round to find the capacity you need for the 600 W evening load:
| Battery | For a 2.5-hour slot | For a 4.5-hour slot |
|---|---|---|
| 51.2 V LiFePO4, 90% depth, 92% inverter | 35.4 Ah (1.81 kWh) | 63.7 Ah (3.26 kWh) |
| 24 V AGM, 50% depth, 90% inverter, k 1.15 | 166.4 Ah (3.99 kWh) | 277.4 Ah (6.66 kWh) |
For the same job the lead-acid bank needs about twice the nominal energy of the lithium one, because you may only use half of it and Peukert takes more at heavy loads. Without Peukert the AGM answer for 4.5 hours would be 250 Ah; the law adds 27 Ah. Round up to the sizes you can buy, and leave margin for ageing, because capacity falls as a battery ages; the data sheet gives the end-of-life capacity the maker uses.
Small loads on DC
For the router and fibre box alone, skip the inverter. A 12.8 V 12 Ah lithium mini-UPS feeding 18 W (with 90% conversion in the DC converter) runs for about 6 h 55 min at 90% depth, enough for two back-to-back slots. Many households keep that separate from the main inverter so the internet stays up even if the big battery runs flat.
Rules for the installation
A battery and inverter wired into the house is part of the electrical installation. Eskom's small-scale embedded generation page says households and small businesses with grid-tied small-scale embedded generation systems under 100 kVA, such as solar, must register with Eskom even if they do not export (it lists battery storage among the technologies that can qualify), but it does not say whether a battery-only backup inverter with no panels counts, so ask Eskom or your municipality. It also says that inverters need an NRS 097-2-1 type test certificate, that fully off-grid customers are exempt if they can prove full independence, and that a valid Certificate of Compliance signed by registered persons is required. Eskom's procedure for certificates of compliance ties this to SANS 10142-1. If you are on a municipal supply, your municipality sets its own registration rules. Have a registered electrician do the wiring and issue the CoC; the runtime maths does not change who signs.
What the simple model leaves out
- Cold mornings. Lead-acid capacity drops in the cold, which matters for a battery in an unheated garage on the Highveld in winter. Lithium batteries also restrict charging below about 0 °C, per their data sheets.
- Ageing and cut-off. Inverters shut down at a set voltage, sometimes before the battery is truly empty, and every battery loses capacity with use.
- Cycling loads. A fridge's compressor switches on and off; use the average watts from a plug-in energy meter, not the nameplate peak.
Tools for this job
- Load Shedding Battery Runtime Calculator: runtime for any battery, load, inverter and depth of discharge, with Peukert for lead-acid and the 2.5-hour target preset.
- Solar Panel Calculator: panels and battery for recharging between slots.
- Ohm's Law Calculator: currents and cable loads on the DC side.
The US edition of this guide works the same maths with a 1,200 Wh AGM battery and US loads.
Frequently asked questions
How long will a 5 kWh lithium battery last during load shedding?
At an average 600 W through a 92% inverter and 90% depth of discharge, about 7 hours, enough for a 4.5-hour slot. At 1,200 W it falls to about 3.5 hours.
Are two 12 V batteries in series better than one big 12 V battery?
For runtime, two 12 V 100 Ah batteries in series and one 12 V 200 Ah battery store the same 2,400 Wh and give the same runtime, Peukert included. Series halves the current in the cables and suits a 24 V inverter, which is the practical reason to choose it.
How big a battery do I need for a 4-hour slot?
Size for 4.5 hours, because Eskom adds 30 minutes for switching. For a 600 W load that is about 3.3 kWh of lithium or about 277 Ah of 24 V AGM.
Do I have to register a home battery and inverter with Eskom?
Eskom says grid-tied small-scale embedded generation systems under 100 kVA, such as solar, must be registered even if they never export, and need a Certificate of Compliance signed by registered persons. Its page does not say whether a battery-only backup inverter counts, so ask Eskom or your municipality. Fully off-grid systems are exempt if you can prove independence from Eskom's supply. Municipal customers follow their municipality's rules.
Sources and further reading
- Interpreting load shedding schedules, Eskom. Block lengths, the 30-minute switching allowance and slots per stage.
- Small-scale embedded generation, Eskom Distribution. Registration, off-grid exemption, NRS 097-2-1 and the CoC.
- Management of certificates of compliance for electrical installations, Eskom Distribution. Revision 3.
- A critical review of using the Peukert equation for determining the remaining capacity of lead-acid and lithium-ion batteries, Journal of Power Sources. Doerffel and Abu Sharkh, 2006.
- Expanding the Peukert equation with a temperature dependency, Journal of Power Sources. Hausmann and Depcik, 2013, on cold and Peukert behaviour.
Open the Battery Runtime Calculator
More Electrical
Every tool in the Electrical section, free and in your browser.