South Africa version. Built around Eskom's load-shedding blocks: 2 hours, or 4 hours in some areas, plus up to 30 minutes for switching, so the target runtime starts at 2.5 hours. US version

Load Shedding Battery Runtime Calculator

How long a battery and inverter will last through a load-shedding block, and the Ah or kWh you need for a 2.5-hour or 4.5-hour slot, with Peukert for lead-acid.

The interactive tool loads here when JavaScript runs.

About this tool

What is the Battery Runtime Calculator?

The question most South African households ask of a battery is whether it will last through a load-shedding slot. Eskom's schedule guide explains that stages 1 to 4 are mostly carried out in 2-hour blocks, that Eskom-supplied Johannesburg areas use 4-hour blocks, and that each period has 30 minutes added for switching the network. A battery that covers 2 hours on paper can therefore fall short; this version sets the target to 2.5 hours.

Enter the battery from its label, the load you want to keep running (router, lights, TV, a laptop, perhaps the gate motor) and whether it runs through an inverter. For a 12 V 100 Ah AGM battery feeding 150 W through a 90% inverter at 50% depth of discharge, the tool gives 3 h 5 min, enough for a 2.5-hour block with a little to spare.

The battery has to recharge before the next slot too. At stage 4, Eskom's guide says an area can be shed up to 12 times over four days in 2-hour blocks, so check that the charger or solar input can refill the usable capacity in the gap between slots.

  • Ah or Wh input with any battery voltage
  • Chemistry presets for depth of discharge and Peukert exponent
  • Inverter efficiency or direct DC loads
  • Battery size needed for a target runtime
  • Runtime table at other loads, copy and share
Read the guide: Battery Runtime and Peukert's Law: How Long Will It Last?

Updated

How to use the Battery Runtime Calculator

  1. Choose the battery chemistry; this sets typical depth of discharge and Peukert exponent, which you can edit.
  2. Enter capacity in Ah or Wh and the nominal voltage of the battery or bank.
  3. Enter the load in watts and choose AC through an inverter (with its efficiency) or DC direct.
  4. Leave Peukert on for lead-acid and enter the hour rating of the capacity, usually 20.
  5. Read the runtime, battery current and C-rate, and enter a target runtime to see the battery you would need.

Worked examples

Router, lights and TV on a 100 Ah AGM battery

Input

12 V 100 Ah AGM, 150 W AC load, 90% inverter, 50% depth of discharge, Peukert 1.15 at C/20

Output

3 h 5 min (3 h 36 min without Peukert); 13.9 A from the battery; 83.2 Ah needed for 2.5 h

This covers a 2-hour block plus the 30 minutes Eskom adds for switching. It would not cover a 4-hour Johannesburg block without draining the battery well below half, which shortens a lead-acid battery's life.

5 kWh lithium battery through a 4.5-hour block

Input

51.2 V 100 Ah LiFePO4 (5.12 kWh), 800 W AC load, 92% inverter, 90% depth of discharge, Peukert off

Output

5 h 18 min; 17.0 A from the battery; 84.9 Ah (4.35 kWh) needed for 4.5 h

An 800 W evening load (fridge, lights, TV, laptop and a fan) fits a 4-hour block plus switching time with about 48 minutes left. A geyser or kettle on the inverter would empty it far sooner.

Two 12 V batteries in series for a bigger inverter

Input

24 V 200 Ah lead-acid, 400 W AC load, 90% inverter, 50% depth of discharge, Peukert 1.15 at C/20

Output

4 h 55 min (5 h 24 min without Peukert); 185 Ah needed for 4.5 h

Doubling the voltage halves the current for the same load, which reduces the Peukert loss. The bank just covers a 4-hour block with switching time.

Background and insight

The ideal runtime is simple energy accounting: hours = (capacity in Wh × usable depth of discharge) ÷ (load W ÷ inverter efficiency). A 12 V 100 Ah battery holds 1,200 Wh. If you only use half to protect a lead-acid battery, and feed a 100 W AC load through a 90% efficient inverter that draws 111 W from the battery, the runtime is 600 ÷ 111 = 5.4 hours.

Lead-acid capacity depends on discharge rate. Batteries are rated at a fixed time, usually 20 hours (C/20), and deliver less when discharged faster. Wilhelm Peukert described this in 1897 with t = H × (C ÷ (I × H))^k, where C is the rated capacity in Ah over H hours, I the actual current and k the Peukert exponent. k is 1 for an ideal battery, roughly 1.1 to 1.3 for lead-acid (lower for AGM, higher for flooded), and close to 1.05 for LiFePO4. A 100 Ah C/20 battery at 10 A with k = 1.2 lasts 20 × 0.5^1.2 = 8.7 hours, not 10.

Peukert's law is an approximation fitted to constant-current discharges at room temperature. Cold reduces capacity further (a lead-acid battery near freezing may give 20% less), aging reduces it steadily, and inverters draw idle power of several to tens of watts. Use manufacturer discharge tables when you have them; they are more accurate than any single exponent.

Common use cases

  • RV and van builds

    Check how long a fridge, fan and lights will run overnight before you need to start the engine or solar.

  • Home backup

    Estimate how many hours a power station or battery bank keeps a router, CPAP or sump pump going.

  • UPS planning

    Work out runtime for a network rack from its watt draw and the UPS battery Wh.

  • Comparing chemistries

    See how much usable runtime LiFePO4 adds over lead-acid of the same rated Ah.

Tips and limitations

  • Add 30 minutes to the block length for your target. Eskom's schedule guide adds that time to every slot for network switching.
  • Keep heating loads (geyser, kettle, hairdryer, stove) off a small inverter. They draw more in one hour than a router and lights use in a whole block.
  • Count the inverter's own idle draw from its data sheet; it runs whenever the inverter is on, which matters on long, light-load nights.
  • Lead-acid batteries lose capacity when drained fast and when old. If an older battery no longer lasts a block, measure the runtime at a known load and compare it with this estimate.

Sources and further reading

  1. Interpreting load shedding schedules, Eskom. Stage sizes in MW, 2-hour and 4-hour blocks with 30 minutes added for switching, and how often an area is shed per stage.
  2. Small-scale embedded generation (SSEG), Eskom Distribution. Registration for grid-tied systems, exemption for fully off-grid systems, and the documents an application needs.
  3. Management of certificates of compliance for electrical installations (240-170000465, revision 3), Eskom Distribution. Grid-tied and hybrid systems must be registered even if they do not export; off-grid generators need a customer declaration and must comply with SANS 10142-1.

Frequently asked questions

How long is a load-shedding slot?

According to Eskom's guide to interpreting schedules, stages 1 to 4 are carried out in 2-hour blocks in most of the country and 4-hour blocks in Eskom-supplied Johannesburg areas, with 30 minutes added to each for switching. From stage 5 to 8 the blocks progressively double to 4 hours.

Will a 100 Ah battery last through load shedding?

It depends on the load. A 12 V 100 Ah AGM battery at 50% depth of discharge runs 150 W through an inverter for about 3 hours, enough for a 2.5-hour slot. At 400 W the same battery gives only about 1 hour, because Peukert losses grow with the current. Put your own load in watts into the calculator.

How many times a day will my battery have to cover an outage?

Eskom's guide counts outages over four days: up to 3 two-hour slots at stage 1, 6 at stage 2, 9 at stage 3 and 12 at stage 4, rising to up to 12 four-hour slots at stage 8. At higher stages the time between slots is short, so recharge time matters as much as capacity.

Should I choose lithium or lead-acid for load shedding?

Lithium iron phosphate (LiFePO4) is commonly used to 80 to 90% of its capacity, while lead-acid lasts longer if kept above about half charge. For the same usable energy you therefore need roughly twice the lead-acid Ah. Both work in the calculator: pick the chemistry and it sets a typical depth of discharge.

Do I need to register a battery and inverter with Eskom?

If the inverter is grid-tied or hybrid, Eskom requires its direct customers to register it even if it never exports; fully off-grid systems are exempt but need a declaration. Eskom's certificate of compliance procedure also says embedded generation installations, whether grid-tied, hybrid or off-grid, must be signed off by registered persons and included in the Certificate of Compliance.

What size battery do I need for a 4-hour block?

Set the target runtime to 4.5 hours to include switching time. For an 800 W load through a 92% inverter on a 51.2 V lithium battery at 90% depth of discharge, the tool asks for about 85 Ah, or 4.35 kWh.

Is there an in-depth guide to the Battery Runtime Calculator?