What is the Transformer Sizing Calculator?

When a farm, mine workshop or factory outgrows a low-voltage supply, the next step is usually a dedicated transformer fed from Eskom's medium-voltage network, which the connection charges procedure describes as normally 11 or 22 kV (33 kV on some designated rural lines). This version starts on an 11 kV primary, a 400 V secondary and the IEC series of ratings: 100, 160, 200, 250, 315, 400, 500, 630, 800 kVA and up.

Enter the maximum demand as kW with a power factor, as kVA or as measured amps. The calculator adds a spare margin, picks the next rating and shows the primary and secondary full-load currents. A 150 kW load at 0.9 with 20% spare needs exactly 200 kVA, which carries 288.7 A on the 400 V side and 10.5 A at 11 kV.

The kVA you design for also becomes a tariff number. On Megaflex and Miniflex the network capacity charges are in rand per kVA of annual utilised capacity, the higher of your notified maximum demand (NMD) and the demand actually measured, so an oversized NMD costs money every month.

  • Load from kW and PF, kVA or amps
  • Spare capacity and next standard rating (ANSI or IEC lists)
  • Primary and secondary full-load and actual load currents
  • Voltage (turns) ratio
  • Comparison table of neighbouring sizes
Read the guide: Transformer Sizing: kVA, Full-Load Amps and Standard Ratings

Updated

How to use the Transformer Sizing Calculator

  1. Choose single-phase or three-phase.
  2. Enter the load as kW with power factor, as kVA, or as amps at the secondary voltage.
  3. Set the spare capacity you want, for example 20% for growth.
  4. Enter the primary and secondary voltages (line to line for three-phase) and choose North American or IEC ratings.
  5. Read the standard size, how heavily it is loaded today, the full-load currents and the voltage ratio.

Worked examples

Packhouse on an 11 kV rural line

Input

Three-phase, 150 kW at PF 0.9, 20% spare, 11 000 V to 400 V, IEC ratings

Output

166.7 kVA load, 200 kVA required, 200 kVA unit (83% loaded); 10.50 A at 11 kV, 288.7 A at 400 V

The required kVA lands exactly on a standard rating. With no margin for cold-room expansion, many designers would still compare the 250 kVA option and its cost before deciding.

Factory on a 22 kV feeder

Input

Three-phase, 600 kW at PF 0.92, 20% spare, 22 000 V to 400 V, IEC ratings

Output

652.2 kVA load, 782.6 kVA required, 800 kVA (81.5% loaded); 21.0 A at 22 kV, 1 154.7 A at 400 V

The 400 V side current sets the size of the main LV breaker and the busbar or cables to the main board. At 22 kV the primary current is only 21 A, so the medium-voltage switchgear and cable are small by comparison.

Small borehole and irrigation load

Input

Three-phase, 85 kW at PF 0.9, 25% spare, 22 000 V to 400 V, IEC ratings

Output

94.4 kVA load, 118.1 kVA required, 160 kVA (59% loaded); 4.20 A at 22 kV, 230.9 A at 400 V

The IEC list jumps from 100 to 160 kVA, so a modest margin pushes the choice up a size. The loading column in the table under the result shows how the 100 kVA option would sit at 94% before any growth.

Background and insight

Transformers are rated in kVA rather than kW because their heating depends on current and voltage, not on the power factor of the load. Full-load current is I = kVA × 1000 ÷ V for single-phase and I = kVA × 1000 ÷ (√3 × V(LL)) for three-phase. A 75 kVA three-phase unit stepping 480 V down to 208Y/120 V carries 90.2 A on the primary and 208.2 A on the secondary.

The load figure should be the calculated demand, after any diversity your code allows, not the sum of nameplates. Designers then add spare capacity, commonly 20 to 25%, so that the unit runs at about 80% of its rating today. That margin covers growth, keeps losses and temperature rise down, and leaves room for motor starting. Harmonic-rich loads (computers, drives, LED drivers) may need a K-factor rated transformer or a further derating.

For an ideal transformer the voltage ratio equals the turns ratio, a = Vp ÷ Vs = Np ÷ Ns, and current goes the other way: Is = Ip × a. In three-phase units the per-winding ratio depends on the connection; a delta-wye 480 to 208Y/120 V transformer has 480 V on each delta winding and 120 V on each wye winding, a winding ratio of 4:1, even though the line-to-line ratio is 2.31:1. Ratings follow ANSI/IEEE C57.12 series standards in North America and IEC 60076 elsewhere; protection follows NEC 450.3 or your local code.

Common use cases

  • Specifying a step-down transformer

    Choose the kVA for a 480 to 208/120 V panel feeding receptacles and lighting.

  • Machine isolation transformers

    Size a control or isolation transformer for imported equipment that needs a different voltage.

  • Checking an existing unit

    See how loaded a transformer is by entering the measured secondary amps.

  • Planning protection

    Get primary and secondary full-load amps as the starting point for breakers and conductors.

Tips and limitations

  • Size on the after-diversity maximum demand, the highest 30-minute average you expect, rather than the sum of nameplates. Eskom measures maximum demand over 30-minute integrating periods, so short motor starts do not set it.
  • Customers above 100 kVA must keep power factor at or above 0.9 lagging under the Distribution Network Code; correcting it also lowers the kVA the transformer and NMD must cover.
  • Ask the transformer supplier for the no-load secondary voltage on the data sheet (often higher than 400 V) and enter the value it quotes when comparing full-load currents.
  • Agree protection settings at the point of supply with Eskom or the municipality early; the primary protection must grade with theirs.

Sources and further reading

  1. Connection charges for customers connected to Eskom's distribution network (procedure), Eskom Distribution. Definitions: LV networks normally supply at 400/230 V three-phase or 230 V single-phase; MV reticulation is normally 11 or 22 kV.
  2. Tariffs and Charges Booklet 2026/2027, Eskom Distribution. Definitions of notified maximum demand, annual utilised capacity and the R/kVA network capacity charges on Megaflex and Miniflex.
  3. South African Distribution Network Code, version 6.2, NERSA / Eskom Distribution. Clause 6.3: load power factor of at least 0.9 lagging for customers above 100 kVA.
  4. Management of certificates of compliance for electrical installations (240-170000465, revision 3), Eskom Distribution. Certificates of Compliance for LV installations (SANS 10142-1) and MV installation safety reports (SANS 10142-2).
  5. IEC 60076-1 Power transformers: General, International Electrotechnical Commission

Frequently asked questions

What medium voltage will Eskom supply?

Eskom's connection charges procedure describes the medium-voltage reticulation network as normally 11 or 22 kV, with some rural networks designated at 33 kV. Enter the supply voltage Eskom gives for your connection as the primary.

How many amps is a 315 kVA transformer at 400 V?

315 000 ÷ (√3 × 400) = 454.7 A on the 400 V side, and 16.5 A at an 11 kV primary. Set the load to 315 kVA with no spare to check any rating this way.

Which transformer sizes can I choose from?

Pick "IEC 60076 (R10 series)" and the calculator rounds up within 25, 50, 63, 100, 160, 200, 250, 315, 400, 500, 630, 800, 1 000, 1 250, 1 600, 2 000, 2 500 and 3 150 kVA. Confirm with the supplier what is built for your primary voltage.

How does transformer size relate to my NMD?

The NMD is the maximum demand in kVA you contract with Eskom per point of supply. The transformer must carry at least that, plus margin. The tariff charges network capacity on the higher of the NMD and the measured maximum demand, so set the NMD from your real demand and let the transformer carry the spare.

Which wiring rules apply on the 400 V side?

Low-voltage installations are designed and certified to SANS 10142-1, with a Certificate of Compliance from a registered person. Medium-voltage installations have their own part, SANS 10142-2.

Should I plan for 80% loading?

It is a common starting point. A plant with growth plans, hot plant rooms or many drives may need more margin; a site with a steady, well-known demand can run closer to the rating.

Is there an in-depth guide to the Transformer Sizing Calculator?

Yes. “Transformer Sizing: kVA, Full-Load Amps and Standard Ratings” covers the background, how it works, common pitfalls and worked examples. Read the full guide.